Skip to content
PET STILL-WATER MACHINE SELECTION DESK US+1 818 262 0958
Allot TechFilling machine center

Engineering evidence / controlled bottle drawing

PET Bottle Drawing Requirements for Water Filling Machines

Bottle volume and a photograph cannot define machine handling. Give engineering a dimensioned drawing, its revision and identified bottle/cap samples before guides, grippers or format parts are confirmed.

PET bottle rinsing, water filling and capping monoblock shown in the Allot Tech catalog
Allot Tech 2026 catalog · reference equipmentReference values require project-specific confirmation.
Answer first

Submit a revision-controlled dimensioned bottle drawing, neck/support-ring and matching cap details, plus labeled samples for every intended format. Identify unknowns and changes; engineering review still must confirm handling compatibility and format-part scope.

Build one traceable bottle evidence package

  1. Record dimensions and document identity

    State drawing number, revision, date, units and SKU. Include overall height, maximum diameter or width, body and base geometry, empty-bottle weight and material. Identify critical dimensions and their agreed tolerances; leave unknowns for confirmation instead of assuming that nominal volume defines the shape.

  2. Describe the neck, support ring and closure

    Provide dimensioned neck-finish, thread and support-ring details, including ring position, diameter and thickness. Link the intended cap drawing and sample. These support a review of neck handling, rinser contact and cap pairing; a similar-looking neck or a diameter label alone does not prove compatibility.

  3. Match every sample to its revision

    Create a format list connecting each SKU to bottle drawing revision, labeled bottle sample and matching cap sample. Distinguish current production evidence from development samples. Ask the supplier to identify received samples and missing fields before design freeze; one reviewed format does not automatically approve the rest.

  4. Control changes after review

    Separate superseded drawings and samples from the approved package. If the neck, ring, body, material or weight changes, record a new revision and request review of affected handling and format parts. A complete package enables engineering review; final compatibility and change-part scope still require written confirmation.

01

Suitable for

Projects that match this page decision

  • New-machine projects freezing a PET bottle format
  • Multi-SKU projects that need a format matrix
  • Replacement projects checking existing transfer geometry
02

Not suitable for

Boundaries that need a different platform or review

  • Submitting only bottle volume or a marketing photograph
  • Treating an unapproved sample as the production standard
  • Assuming similar-looking necks and caps are interchangeable
03

Inputs required

Evidence to provide before confirmation

  • Dimensioned bottle drawing with units and revision
  • Neck-finish and support-ring detail
  • Empty-bottle weight, material and base geometry
  • Labeled bottle and cap samples that match the drawing
04

Machine function

What happens at this machine or decision boundary

  • Create one controlled geometry reference for machine review.
  • Link each SKU, bottle sample and cap sample to a revision.
  • Identify which handling parts are common and which require confirmation.
05

Configuration decisions

Options that must appear in the proposal

  • Primary production bottle and allowable format range
  • Neck-handling points through infeed, rinser and transfers
  • Dedicated guides, starwheels or other change parts
06

Interface requirements

Upstream, downstream and utility handovers

  • Air-conveyor support height and entry direction
  • Rinser grip and transfer contact points
  • Filled-bottle discharge stability and downstream handover
07

Buyer risks

Questions to close before order

  • A sample and drawing from different revisions
  • Missing support-ring or neck-finish dimensions
  • Approving machine parts before the production bottle is frozen
08

FAT checks

How to verify the agreed basis

  • Use samples identified by SKU and drawing revision.
  • Observe marks, tipping, jams and transfer stability at agreed conditions.
  • Record any approved adjustment or replacement part against the revision.
09

Quotation scope

What the commercial offer should state

  • Bottle schedule and drawing revisions reviewed
  • Samples received and unresolved dimensions
  • Included format parts and adjustment scope
  • Change-control rule after design approval

Questions to settle before requesting a quote

Can a photograph or bottle volume replace the drawing?

No. A photograph can show shape, but not controlled dimensions, tolerances or revision. Supply a dimensioned drawing with units and labeled matching bottle/cap samples; list unavailable details as open points.

Do all bottle formats need separate evidence?

Identify every format that must run on the filler. Reuse a shared detail only when its identity is confirmed, and keep each SKU's body dimensions, drawing revision and samples traceable.

Does the same neck mean the same change parts?

Not necessarily. Body, base and height can change handling and transfer requirements. Use the drawing package for compatibility review, then obtain a project-specific list of common, adjustable and dedicated parts.

Allot Tech / pet-bottle-drawing-requirements

Turn this decision into a comparable machine scope

Send the bottle, cap, reference output, existing equipment and destination. Final values are confirmed in the project proposal.

Mr Kcal
Allot Tech (Suzhou) Co., Ltd.

Submission is sent to sales@allottech.com. Personal form values are not sent to Google Analytics.