Suitable for
Projects that match this page decision
- Several PET bottle formats using a compatible handling concept
- Plants that can freeze drawings before design approval
- Buyers willing to define a repeatable changeover procedure
Format management / more than one SKU
A second bottle format needs more than a stored recipe. Confirm which physical parts and settings change, how the first bottles will be approved and what the quoted changeover time includes.
Only after reviewing both bottle/cap formats and confirming parts, settings and trials. Specify output for each format separately; a 500 ml catalog rating does not approve 1.5 L performance.
Give every bottle and cap a drawing revision. Compare neck/support ring, height, diameter and shape. Ask the supplier to identify common settings, adjustable guides and dedicated transfer or cap-feed parts for each format.
A selected recipe does not verify installed parts or guide positions. Request a parts/settings checklist, identification and storage plan. Trained personnel must follow the supplied stopping, isolation and changeover instructions.
After the approved conversion, check bottle transfer, rinsing, fill result, cap placement and closure integrity using the new format's agreed conditions. Record startup rejects and approval before releasing normal production.
State the starting and finishing events, personnel, tools and included checks. Last acceptable old-format bottle to accepted new-format production is one possible basis. Verify each required direction and record unresolved parts, training and trial needs.
Projects that match this page decision
Boundaries that need a different platform or review
Evidence to provide before confirmation
What happens at this machine or decision boundary
Options that must appear in the proposal
Upstream, downstream and utility handovers
Questions to close before order
How to verify the agreed basis
What the commercial offer should state
Only after reviewing both bottle/cap formats and confirming parts, settings and trials. Specify output for each format separately; a 500 ml catalog rating does not approve 1.5 L performance.
No. Physical guides, transfer parts and cap handling may also change. The approved procedure must connect the recipe to the actual installed parts and inspected settings.
Named formats and revisions, supplied change parts, adjustment points, tools, instructions, training and trial coverage. Require a defined timing method rather than an unsupported universal changeover time.
Related decision
Calculate preliminary required BPH from daily saleable bottles, net hours, planning efficiency and growth reserve, then compare an XGF reference band.
Allot Tech / bottle-size-changeover
Send the bottle, cap, reference output, existing equipment and destination. Final values are confirmed in the project proposal.