Tool / make commercial scopes comparable

Compare Water Filling Machine Quotations

Compare machine quotations using one bottle, cap and output brief. Separate missing scope, technical deviations and buyer-supplied items before comparing prices.

PET bottle rinsing, water filling and capping monoblock shown in the Allot Tech catalog
Allot Tech 2026 catalog · reference equipmentReference values require project-specific confirmation.
Answer first

Give both suppliers the same revision of the bottle and cap drawings, required saleable BPH, format list, electrical supply and machine handover points. Record the rating bottle and test conditions. A shared model code or BPH number does not establish equivalent equipment.

Tool 03 / quotation scope

Compare supplier scopes on the same bottle and output basis

First issue the same bottle drawing, cap drawing, required BPH and delivery boundary. Matching scope labels do not prove matching specifications or performance. This tool flags questions; it does not rank suppliers.

Scope row
Main machine
Air conveyor
Cap elevator
Cap sorter
Bottle outfeed
Product-water tank
Pumps and piping
Change parts
Spare parts
FAT
Installation
Shipping
Documentation
Unstated supplier entries26
Rows with different scope0
Questions to ask

    All-excluded rows still need a named responsible party if the item is required. A zero gap count is not approval of the machine, price or contract.

    01

    Suitable for

    Projects that match this page decision

    • Shortlisting two or three machine suppliers
    • Explaining scope gaps to a purchasing team
    • Preparing clarification questions before negotiation
    02

    Not suitable for

    Boundaries that need a different platform or review

    • Treating model code as a complete specification
    • Awarding only on the lowest total
    • Assuming unstated items are included
    03

    Inputs required

    Evidence to provide before confirmation

    • Each quotation and technical attachment
    • Reference bottle, cap and output basis
    • Equipment list and commercial exclusions
    • FAT, installation, freight and document scope
    04

    Machine function

    What happens at this machine or decision boundary

    • Each row is marked included, excluded or not stated.
    • The summary finds missing statements and different coverage.
    • Buyer questions are generated from the open rows.
    05

    Configuration decisions

    Options that must appear in the proposal

    • Which supplier has a complete comparable boundary
    • Which differences are technical versus commercial
    • Which exclusions the buyer will source separately
    • Which open points must be closed before order
    06

    Interface requirements

    Upstream, downstream and utility handovers

    • Air conveyor and outfeed coverage
    • Product-water tank, pumps and piping
    • Installation and third-party controls integration
    07

    Buyer risks

    Questions to close before order

    • Duplicate or missing equipment between suppliers
    • Unclear change parts, spares or documentation
    • No agreed FAT or installation responsibility
    08

    FAT checks

    How to verify the agreed basis

    • Compare samples, duration and output method.
    • Compare accepted defects and open-point handling.
    • Compare witness, re-test and shipment-release terms.
    09

    Quotation scope

    What the commercial offer should state

    • Main machine and named options
    • Interfaces and auxiliary equipment
    • Change parts, spares and documentation
    • FAT, installation, shipping and exclusions

    Questions to settle before requesting a quote

    What must be identical before I compare two machine prices?

    Give both suppliers the same revision of the bottle and cap drawings, required saleable BPH, format list, electrical supply and machine handover points. Record the rating bottle and test conditions. A shared model code or BPH number does not establish equivalent equipment.

    How do I compare included, optional and excluded items?

    Create separate rows for the monoblock, air conveyor, cap elevator and sorter, outfeed, water tank, pumps, piping, change parts and spares. For each row record quantity, specification, price status and responsible party. Keep unpriced options and unstated items open; do not treat either as free or included.

    When is a lower quotation actually comparable?

    Compare the machine subtotal and the cost of the same agreed additions separately. Check FAT samples and acceptance, installation labour and travel, documents, export packing and the named delivery boundary. If both suppliers exclude a required item, assign its supply and installation before approval. Matching scope labels alone do not prove matching quality or performance.

    Allot Tech / compare-filling-machine-quotations

    Turn this decision into a comparable machine scope

    Send the bottle, cap, reference output, existing equipment and destination. Final values are confirmed in the project proposal.