Suitable for
Projects that match this page decision
- PET bottled still-water projects preparing a machine quotation
- Buyers comparing a machine-only or machine-plus-interface scope
- Engineering and purchasing teams using one controlled requirement
Technical buying decision / machine-specific evidence
Define neck handling, elevation, spacing, air supply and control handover before the filling monoblock. Final selection remains subject to the approved bottle, cap, output basis and project interfaces.
Use this page to document empty bottle air conveyor requirements before comparing suppliers. Record the physical bottle and cap evidence, the operating basis, the included machine boundary and the acceptance method in the same technical schedule.
Projects that match this page decision
Boundaries that need a different platform or review
Evidence to provide before confirmation
What happens at this machine or decision boundary
Options that must appear in the proposal
Upstream, downstream and utility handovers
Questions to close before order
How to verify the agreed basis
What the commercial offer should state
Search questions / buyer answers
Approved bottle drawing, sample, neck finish and cap evidence. Required saleable output, operating hours and reference format. Existing equipment, utilities, line direction, space and destination.
Named machine configuration and reference basis. Included interfaces, change parts, spares and documents. FAT, installation, shipping, exclusions and confirmation items.
Use approved production-representative bottle and cap samples. Record output, stops, transfer, fill level, leakage and capping observations. Track alarms, interfaces, parts, documents and open points before release.
Allot Tech / empty-bottle-air-conveyor-requirements
Send the bottle, cap, reference output, existing equipment and destination. Final values are confirmed in the project proposal.