Suitable for
Projects that match this page decision
- New factory layouts
- Existing-line replacement projects
- Buyers preparing a site-readiness checklist
Factory readiness / site inputs
Machine dimensions are not the same as installation space. The site also needs operator access, maintenance clearance, cap loading, utility routes, drainage and safe bottle flow.
Submit the available area, ceiling height, access route, line direction, floor condition, voltage, frequency, phase and utility connections before the general arrangement is approved.
Projects that match this page decision
Boundaries that need a different platform or review
Evidence to provide before confirmation
What happens at this machine or decision boundary
Options that must appear in the proposal
Upstream, downstream and utility handovers
Questions to close before order
How to verify the agreed basis
What the commercial offer should state
Allot Tech / installation-utility-requirements
Send the bottle, cap, reference output, existing equipment and destination. Final values are confirmed in the project proposal.