Acceptance / prove the agreed basis
A FAT should test the contracted machine with approved bottles and caps under a written method. A short demonstration without recorded inputs and results is not a comparable acceptance test.
Agree the reference bottle, cap, continuous run time, output calculation, reject treatment, fill-level method, cap checks, alarm tests and document list before the FAT date. Use the builder below to create a project draft.
Tool 04 / FAT draft
Select the items required for your project, add the sample basis, then download a plain-text draft for supplier review.
Projects that match this page decision
Boundaries that need a different platform or review
Evidence to provide before confirmation
What happens at this machine or decision boundary
Options that must appear in the proposal
Upstream, downstream and utility handovers
Questions to close before order
How to verify the agreed basis
What the commercial offer should state