Acceptance execution / measurable factory test

Filling Machine Factory Acceptance Test Procedure

The FAT procedure explains how the agreed machine requirement will be tested and recorded. It is different from a coverage checklist: it fixes prerequisites, sequence, measurement ownership, open points and retest conditions.

Filling Machine Factory Acceptance Test Procedure - Beverage filling equipment manufacturing and project assembly workshop
Allot Tech 2026 catalog imageReference values require project-specific confirmation.
Answer first

Approve the bottle and cap revisions, test conditions, run duration, output boundary, observation method and acceptance criteria before the FAT date. Record stops, rejected bottles and open points separately so a short peak rate cannot replace sustained evidence.

FAT execution / release evidence

Use a sequence that produces an auditable result

The procedure must be approved before the run and must retain deviations instead of hiding them in a summary.

FAT phaseRequired recordExit condition
PrerequisitesSpecification revision, samples, utilities and instrumentsAll test inputs identified
Dry and safety checksGuards, controls, alarms, stops and restart observationsCritical safety or control points closed
Wet setupWater condition, settings and approved formatStable test condition documented
Measured runStart/stop basis, good output, stops and rejectsAgreed run completed or deviation opened
Quality observationsTransfer, fill, leakage, cap and container resultsCriteria evaluated by the agreed method
Release reviewOpen points, owners, due dates and retest methodRelease decision and signatures recorded

Reference values require project-specific confirmation. Project acceptance limits remain in the approved order specification and FAT protocol.

01

Suitable for

Projects that match this page decision

  • Buyers with an approved technical specification and test samples
  • Machine orders that need measurable release evidence
  • Remote or on-site witnesses reviewing one controlled record
02

Not suitable for

Boundaries that need a different platform or review

  • Running unidentified samples or changing the method during the test
  • Using a marketing video as the complete FAT record
  • Inventing acceptance limits after the result is known
03

Inputs required

Evidence to provide before confirmation

  • Approved order specification and drawing revisions
  • Production-representative bottle, cap and water conditions
  • Written run sequence, measurement points and acceptance criteria
  • Witness, evidence, open-point and signature responsibilities
04

Machine function

What happens at this machine or decision boundary

  • Verify prerequisites before the timed or counted run begins.
  • Execute dry, wet, interface and production-representative checks in order.
  • Record results, deviations, open points and any agreed retest.
05

Configuration decisions

Options that must appear in the proposal

  • What starts and stops the measured run
  • How good output, stops and rejected bottles are recorded
  • Which observations require correction before release
06

Interface requirements

Upstream, downstream and utility handovers

  • Test boundary at empty-bottle infeed and filled-bottle outfeed
  • Product-water, cap supply, electrical and control conditions
  • Temporary test equipment or downstream simulation stated in the record
07

Buyer risks

Questions to close before order

  • A test method that differs from the quotation basis
  • Unattributed downtime hidden inside a final average
  • Shipment release with unresolved critical open points
08

FAT checks

How to verify the agreed basis

  • Complete prerequisite and sample-identity checks.
  • Record each run, interruption, observation and evidence file.
  • Assign every open point an owner, due date and retest or closure method.
09

Quotation scope

What the commercial offer should state

  • FAT location, witness route and included test time
  • Sample and utility responsibility
  • Measurement, report and evidence format
  • Correction, retest and shipment-release conditions

Search questions / buyer answers

Questions buyers ask before requesting a quotation

What information is required before confirming Filling Machine Factory Acceptance Test Procedure?

Approved order specification and drawing revisions. Production-representative bottle, cap and water conditions. Written run sequence, measurement points and acceptance criteria. Witness, evidence, open-point and signature responsibilities.

What should the quotation state for Filling Machine Factory Acceptance Test Procedure?

FAT location, witness route and included test time. Sample and utility responsibility. Measurement, report and evidence format. Correction, retest and shipment-release conditions.

How should Filling Machine Factory Acceptance Test Procedure be checked during FAT?

Complete prerequisite and sample-identity checks. Record each run, interruption, observation and evidence file. Assign every open point an owner, due date and retest or closure method.

Allot Tech / filling-machine-factory-acceptance-test

Turn this decision into a comparable machine scope

Send the bottle, cap, reference output, existing equipment and destination. Final values are confirmed in the project proposal.

Submission is sent to sales@allottech.com. Personal form values are not sent to Google Analytics.