Requirement definition / demand-to-BPH calculation

Water Filling Machine Capacity Calculation

Calculate required filling-machine BPH from daily good-bottle demand and available hours, with explicit efficiency and growth assumptions.

PET bottle rinsing, water filling and capping monoblock shown in the Allot Tech catalog
Allot Tech 2026 catalog · reference equipmentReference values require project-specific confirmation.
Answer first

Divide daily saleable bottles by net scheduled production hours and the remaining planning-efficiency factor. Apply growth reserve separately. Deduct planned non-running time when defining the hours; the efficiency factor must cover only losses not already deducted.

Calculation worksheet / visible assumptions

Turn daily demand into a reviewable BPH requirement

Use one equation and keep every input visible: required BPH = saleable bottles ÷ net production hours ÷ planning efficiency. Apply growth reserve as a separate final step.

Worksheet lineIllustrative valueHow to use it
Saleable daily demand80,000 bottlesUse good bottles required, not total attempted production.
Net production time16 hoursExclude planned non-running time before the calculation.
Planning efficiency80% buyer assumptionUse a documented planning input; it is not a machine promise.
Preliminary requirement80,000 ÷ 16 ÷ 0.80 = 6,250 BPHCarry the exact bottle basis with the result.
Growth reserve15% buyer scenario6,250 × 1.15 = 7,188 BPH; compare the next documented reference band.

Reference values require project-specific confirmation. The example demonstrates the method only. Buyer demand, efficiency and reserve must be replaced with project inputs.

Capacity planning

Water filling machine capacity calculator

Required BPH = daily saleable bottles ÷ (net hours × remaining efficiency) × growth factor.

Subtract planned breaks and changeovers from hours first. Efficiency covers only losses not already deducted. Count each loss once; 500 ml catalog ratings do not establish the speed of another bottle format.

01

Suitable for

Projects that match this page decision

  • Buyers who know daily or shift saleable-bottle demand
  • Projects comparing required output with published 500 ml reference bands
  • Teams that can state net production hours and planning assumptions
02

Not suitable for

Boundaries that need a different platform or review

  • Using calendar hours without planned stops or changeovers
  • Applying one 500 ml output to every bottle format
  • Replacing a supplier performance test with a planning calculation
03

Inputs required

Evidence to provide before confirmation

  • Saleable bottles required per day or shift
  • Net production hours available after planned non-running time
  • Buyer-defined planning-efficiency factor and growth reserve
  • Main bottle plus every SKU that must share the machine
04

Machine function

What happens at this machine or decision boundary

  • Convert demand into a transparent preliminary BPH requirement.
  • Run a sensitivity check when hours or planning efficiency change.
  • Pass the result, bottle basis and assumptions to the model-selection page.
05

Configuration decisions

Options that must appear in the proposal

  • Whether demand is average, peak or contractual
  • Which bottle defines the reference calculation
  • How much reserve is justified without oversizing the machine
06

Interface requirements

Upstream, downstream and utility handovers

  • The calculation covers the filling machine, not whole-line OEE.
  • Downstream limitations must be reviewed separately at the interface boundary.
  • Larger or unstable bottles require a project-specific output confirmation.
07

Buyer risks

Questions to close before order

  • Hiding the efficiency assumption inside a single BPH number
  • Adding reserve twice in both demand and model selection
  • Choosing a catalog band before freezing the bottle and cap basis
08

FAT checks

How to verify the agreed basis

  • Carry the approved bottle and target good-output basis into the FAT method.
  • Record sustained output, stops and rejected bottles separately.
  • Compare the observed result with the written order basis, not the calculator alone.
09

Quotation scope

What the commercial offer should state

  • Required saleable BPH and calculation assumptions
  • Reference bottle, additional formats and expected changeovers
  • Proposed model band and project-specific output confirmation
  • FAT run method, measurement boundary and exclusions

Questions to settle before requesting a quote

How do I calculate the required bottles per hour?

Divide daily saleable bottles by net scheduled production hours and the remaining planning-efficiency factor. Apply growth reserve separately. Deduct planned non-running time when defining the hours; the efficiency factor must cover only losses not already deducted.

What capacity is needed for 48,000 bottles per day?

Illustrative assumptions: 8 net hours, 80% remaining planning efficiency and 10% growth reserve. The requirement is 48,000 ÷ (8 × 0.80) × 1.10 = 8,250 BPH. These are buyer planning assumptions, not a tested machine performance claim.

Can I use a 500 ml rating for 1.5 L bottles?

No automatic conversion is reliable. Larger fill volume, bottle geometry and transfer behavior can change output. Ask for a separate sustained good-bottle rate for every required format, measured with the approved cap and agreed FAT conditions.

Allot Tech / water-filling-machine-capacity-calculation

Turn this decision into a comparable machine scope

Send the bottle, cap, reference output, existing equipment and destination. Final values are confirmed in the project proposal.

Mr Kcal
Allot Tech (Suzhou) Co., Ltd.

Submission is sent to sales@allottech.com. Personal form values are not sent to Google Analytics.