Suitable for
Projects that match this page decision
- New factory layouts
- Existing-line replacement projects
- Buyers preparing a site-readiness checklist
Factory readiness / site inputs
Machine dimensions are not the same as installation space. The site also needs operator access, maintenance clearance, cap loading, utility routes, drainage and safe bottle flow.
Submit the available area, ceiling height, access route, line direction, floor condition, voltage, frequency, phase and utility connections before the general arrangement is approved.
Projects that match this page decision
Boundaries that need a different platform or review
Evidence to provide before confirmation
What happens at this machine or decision boundary
Options that must appear in the proposal
Upstream, downstream and utility handovers
Questions to close before order
How to verify the agreed basis
What the commercial offer should state
Available length, width, height and access doors. Voltage, frequency, phase and local electrical rules. Water, drainage and compressed-air availability. Floor, lighting, ventilation and maintenance access.
Final general arrangement and connection list. Power and utility basis. Site work, lifting and installation exclusions. Commissioning prerequisites and buyer responsibilities.
Check nameplate electrical data against the order. Confirm connection drawings and utility schedule. Verify supplied manuals show safe access and service points.
Related decision
Decide whether to buy only the rinsing-filling-capping monoblock, add interface equipment, or request a complete bottled-water line.
Allot Tech / installation-utility-requirements
Send the bottle, cap, reference output, existing equipment and destination. Final values are confirmed in the project proposal.