Suitable for
Projects that match this page decision
- Shortlisting two or three machine suppliers
- Explaining scope gaps to a purchasing team
- Preparing clarification questions before negotiation
Tool / make commercial scopes comparable
Compare machine quotations using one bottle, cap and output brief. Separate missing scope, technical deviations and buyer-supplied items before comparing prices.
Give both suppliers the same revision of the bottle and cap drawings, required saleable BPH, format list, electrical supply and machine handover points. Record the rating bottle and test conditions. A shared model code or BPH number does not establish equivalent equipment.
Tool 03 / quotation scope
First issue the same bottle drawing, cap drawing, required BPH and delivery boundary. Matching scope labels do not prove matching specifications or performance. This tool flags questions; it does not rank suppliers.
| Scope row | |||
|---|---|---|---|
| Main machine | |||
| Air conveyor | |||
| Cap elevator | |||
| Cap sorter | |||
| Bottle outfeed | |||
| Product-water tank | |||
| Pumps and piping | |||
| Change parts | |||
| Spare parts | |||
| FAT | |||
| Installation | |||
| Shipping | |||
| Documentation |
All-excluded rows still need a named responsible party if the item is required. A zero gap count is not approval of the machine, price or contract.
Projects that match this page decision
Boundaries that need a different platform or review
Evidence to provide before confirmation
What happens at this machine or decision boundary
Options that must appear in the proposal
Upstream, downstream and utility handovers
Questions to close before order
How to verify the agreed basis
What the commercial offer should state
Give both suppliers the same revision of the bottle and cap drawings, required saleable BPH, format list, electrical supply and machine handover points. Record the rating bottle and test conditions. A shared model code or BPH number does not establish equivalent equipment.
Create separate rows for the monoblock, air conveyor, cap elevator and sorter, outfeed, water tank, pumps, piping, change parts and spares. For each row record quantity, specification, price status and responsible party. Keep unpriced options and unstated items open; do not treat either as free or included.
Compare the machine subtotal and the cost of the same agreed additions separately. Check FAT samples and acceptance, installation labour and travel, documents, export packing and the named delivery boundary. If both suppliers exclude a required item, assign its supply and installation before approval. Matching scope labels alone do not prove matching quality or performance.
Related decision
Compare machine quotations using one bottle, cap and output brief. Separate missing scope, technical deviations and buyer-supplied items before comparing prices.
Allot Tech / compare-filling-machine-quotations
Send the bottle, cap, reference output, existing equipment and destination. Final values are confirmed in the project proposal.
Mr Kcal
Allot Tech (Suzhou) Co., Ltd.