Suitable for
Projects that match this page decision
- Non-carbonated purified, mineral, spring or drinking water
- PET bottles approved for the selected filling and transfer method
- Projects with a defined treated-water supply condition
Zone 02 / product filling
Normal-pressure filling is a reference platform for still water, but stable performance depends on the treated-water boundary, bottle geometry, operating conditions and an agreed test method.
Specify the product-water supply and reference bottle together. A quotation should state where the supplier scope begins, whether a product-water tank or pump is included, and how fill level, output and leakage will be judged during FAT.
Projects that match this page decision
Boundaries that need a different platform or review
Evidence to provide before confirmation
What happens at this machine or decision boundary
Options that must appear in the proposal
Upstream, downstream and utility handovers
Questions to close before order
How to verify the agreed basis
What the commercial offer should state
Allot Tech / normal-pressure-water-filling
Send the bottle, cap, reference output, existing equipment and destination. Final values are confirmed in the project proposal.